Showing posts with label unassigned funds. Show all posts
Showing posts with label unassigned funds. Show all posts

Monday, September 8, 2014

PIO forgot this reputable source

Our Public Information Officer seems to have forgotten to mention another reputable source. No, not Lebo Citizens. I said a R E P U T A B L E source. Commissioner Kelly Fraasch, the only working commissioner updated her blog over the weekend with the following posts,  PAYT Presentation
and Update for Unassigned Funds.

There will be a presentation given to the commissioners tomorrow evening during the Commission Discussion Session on Pay As You Throw. Residents will be able to ask questions or comment during the commission meeting which follows at 8:00 PM.

Additionally, these items were removed from the Unassigned Funds Wish List:

  • Iroquois fill and grass-Provides removing mulch from old play area and leveling the surface with topsoil and planting grass. $3,500
  • Pathway around pool-Pathway outside of the swim center that acts as a connector from the Vee Lynn Drive to the recreation center. $41,170
  • Sidewalks at tennis center-Pave remaining asphalt paths with concrete. $100,000
  • Golf Course Pavillion-Place a pavilion near the first tee for outings and special events. $60,000
  • Replace Rockwood park rubber sidewalks $1,500
  • Replace Martha’s playground rubber surface $15,000
  • Public Works Facility Improvements- Add vehicle maintenance bays, addition to existing building and site improvements. $1,252,600
Commissioners Linfante, Brumfield, Bendel, and Silverman, instead, have assigned over $800,000 to fund a project that doesn't sit well with the Pennsylvania Department of Environmental Protection.

Friday, August 29, 2014

BTW, we want artificial turf for the Rock Pile

The commissioners filled a vacancy on the Environmental Sustainability Board (ESB) on Monday evening. Not sure of the circumstances for this new appointment, I asked during Citizens Comments for more details. Apparently, the school board directors no longer want to be a part of the ESB.

The following is a letter to Kristen Linfante and Steve Feller, from school board president, Elaine Cappucci:

On Jun 11, 2014, at 4:34 PM, Elaine Cappucci <ECappucci@mtlsd.net> wrote:
Kristen and Steve,

As you know, there is currently one open position on the Environmental Sustainability Board, and the School Board is slated to select a candidate.

In past years, there have been two open seats at a time, and the municipality has advertised the openings and accepted resumes and applications which were then sent on to us after the commission chose a candidate.  Unlike the commission, the School Board does not operate any other volunteer boards like the ESB.  We do not have any applications for the currently open seat.

When the ESB was formed, its purpose was to gain local government approval of the Mt. Lebanon Climate Action Plan, which was prepared by a group of resident volunteers interested in reducing energy use in Mt. Lebanon.  Both the commission and the School Board approved the plan and formation of the ESB.  The goal of the Action Plan was to reduce greenhouse gas emissions by reducing energy consumption, a goal the School District continuously works on.  Since that time the ESB has expanded their role, but the majority of their work has been on issues pertaining to the municipality, not the School District.  Our role in the ESB is limited to projects within our buildings, while the commission’s responsibilities are more far-reaching. 

We would like to ask the commission to appoint a new ESB member to the open position this year and for the next two open School Board positions since you have the pool of candidates for volunteer board positions.  At the end of that process, the ESB would be a board of the commission.

Respectfully,
Elaine
So the school board wants to back out of the ESB. This move falls in line with the school board's desire to tear down Building C, built in 1972 and supports their future capital project of artificially turfing the Rock Pile.

The commission president blindly honored Elaine Cappucci's request and never realized that it was a violation of the Municipality of Mt. Lebanon Administrative Code. 

140.2 Membership and Term. The Environmental Sustainability Board shall consist of seven (7) members each appointed for a three (3) year term. The initial terms of board members shall be one (1), two (2) and three (3) years. No more than three (3) members’ terms shall expire in any one year. Three (3) board members shall be appointed by the municipality, three (3) shall be appointed by the Mt. Lebanon School District and one (1) shall be selected by the six (6) seated members.
I asked if the ordinance needed to be amended, and the solicitor's response was, "Yes."

Additionally, I asked for the list of unassigned funds discussed at the Commission Discussion Session. Kristen was referring to items by letter, instead of explaining what each line item was for the public's benefit. That list has been posted on the municipal website. I could not find it on the website, so Steve Feller sent this to me this morning.

The link is: http://mtlebanon.org/DocumentCenter/View/10437
It was posted the next morning under finance dept.with a paragraph stating: 
Finance Department 
Documents
  • The Commission had a public hearing on June 23, 2014 to consider projects for the unassigned fund balance and received comments at that hearing. Since then there have been a few additions. Here are the most recent items that are being considered, all of them under the general categories that previously were discussed. 2014 Capital worksheet
Thanks.
Steve 
Kristen would not approve items O and P, feeling that there was a statement being made. She went on to say that it had something to do with those opposed to artificial turf. Unfortunately, there is no statement being made. I can vouch for the need in Rockwood Park. The black rubber sidewalks are a perfect palette for sidewalk chalk drawings during cool weather like we had yesterday, but the children cannot walk on the black rubber in hot weather, let alone sit on the walk while creating their masterpieces. Unfortunately $1,500 is money not well spent, in Kristen's mind.